Your project begins with a collaborative consultation and site study to evaluate access, setbacks, easements, utilities, slope, and soil conditions. We align your wish list and budget, review HOA guidelines, and outline permitting needs, then produce a clear scope so you know exactly what’s included.
Next, we develop 2D plans and immersive 3D renderings with sun and shade studies, material boards, and multiple options to compare cost and value. You receive line-item pricing with value-engineered alternates, a permitting game plan, and a realistic schedule—typically 8–14 weeks for a standard pool, depending on scope, weather, and inspections.
During construction, a dedicated project manager provides regular updates while crews follow documented quality checkpoints for steel placement, plumbing pressure tests, shotcrete application, tile and coping, decking, and interior finish. At startup, we balance water chemistry, fine-tune equipment, and provide hands-on training, plus you receive as-builts, warranties, and optional maintenance plans.